========================
== StephensVille RV10 ==
========================
Time Capsule of Building a Vans RV-10

flaps started

Started the flaps this weekend. Put the skeleton together for match drilling after completing the attach brackets. Glad I built two tables so I could slide them together. The flaps are about 8 feet long.

wing 013

Got the top, bottom, and nose skins on for match drilling. Lots of clecos in use. I think I used up my entire supply (not sure how many I have total anymore). All but maybe five or so. Now comes the tedious work again. Have to match drill all these holes, deburr, dimple, and prime.

wing 014