========================
== StephensVille RV10 ==
========================
Time Capsule of Building a Vans RV-10

grunt work done misc

Not much (well, none at all) in the way of pictures this post. I’ve finally finished deburring and dimpling all the holes in the tailcone. Took a while, lots of holes. Started priming and was able to get all the bulkheads and battery channel riveted.

Finally got the N-number reserved. It will be N428RV. $10/year to the FAA lets you keep the number reserved.

Also got on the waiting list for a small t-hanger at Deer Valley Airport (DVT).