rv10.stephensville.com

Flying a Vans RV-10.

Baggage Door Section 34 Complete

Completed Section 34 today by attaching the baggage door and the left baggage panel. Still some small adjustments to the door needed, but those can wait.

Baggage Door

Baggage Door Attached

Added Dynaliner before closing out the left panel.

Baggage Door

Strike plate for baggage door lock.

Strike Plate For Baggage Door

Left baggage panel close-out.

Left Baggage Cover