After getting the left tank to the same stage as the right, the vent lines and fuel float senders were installed.
Brad’s out here for the week for a building vacation. Things are going much quicker with a second set of hands around.
The tanks were closed up after that and are now complete. Here’s a shot of the completed tanks. Just waiting for the proseal to cure before doing a leak test.