rv10.stephensville.com

Flying a Vans RV-10.

Tore It Down

Fabricated the elevator stops and matched drilled them along with the aft deck. Turning into a pro at fabrication of these parts. After a few of them it’s nothing anymore.

tail 008

Also match drilled the shoulder harness brackets. The whole assembly was then tore down and is now lying in pieces on the garage floor. I hated to do that after getting it all together. Lots of deburring, dimpling, counter sinking, and priming to come!

tail 009